PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavating for the underground plumbing Facing North (800x600).jpg Installing steel angles for the decking at Elev. 7 (2nd Floor) Facing South-West (800x600).jpg Plumbing pipes for the underground roughing Facing North (800x600).jpg Safety cables and poles at Derrick -2 Facing South (800x600).jpg Metal Decking at Derrick -3 (3rd Floor) Facing East (800x600).jpg
Next page Excavating for the underground plumbing Facing North (800x600)
Excavating for the underground plumbing Facing North (800x600)